Printable builder · Portrait · 1 page

The Closeout Checklist

Final close of one project phase — item, owner, done?, blocker. Distinct from the Punch List (pre-handover defects): this is phase closeout, not defect capture. The tinted panel counts open items with no blocker named.

Best for
Closing a phase with a named blocker on every open item — instead of a checklist that never ends.
Badge
Composed
A still life that evokes the The Closeout Checklist

Customize

Build your closeout checklist

Step 01 · The closeout

Step 02 · Items

One per line: item | owner | done? | blocker. Mark done as yes, done, or complete. Open items with blank / — / none blocker count as orphans.

Name the phase.

Preview

Click a sample to enlarge. Your live preview above updates as you edit — download uses the green button in the builder.

Filled example
Blank layout
Alt style